90%

of Lean Six Sigma

projects failed*


DON'T BE ONE OF THEM



Plan for success with Maxi-Q, the world's most powerful and comprehensive quality improvement toolset, backed by the world's most respected process statistician.


Dr Wheeler — PhD Statistics
Dr Burns — PhD Chemical Engineering
MAXI-Q
Process Change75100125UCLLCLAvIndividual value 02040UCLLCL 0AvMoving range
XmR Control ChartAn action chart ideal for both variable and count data.
MENcontractorsMETHODoldmodifiednewfastMATERIALSstainless316304MACHINESstampingPressing failuresPress stops on coldstart, Sydney plant,since 2/2026
Cause and EffectBrainstorm, drag to Affinity groups, automatically generate editable Cause and Effect Diagram.
4.7555.255.5overall averageMachine AMachine BMachine CGroup average
Analysis of MeansClear, simple, powerful, analysis of differences between groups.
050100ScratchedWrong labelShort fillDentedCap looseColour offOther80%0%25%50%75%100%How many
ParetoAbout 80% of consequences come from 20% of causes
Steel bracket : current stateMichigan SteelWeekly deliveryState Street Assembly18400 / monthProduction ControlMRPMonthly ordersWeekly orderWeeklyDailyI4600 pcs5 daysprocessStampingC/T1 sC/O1 hrUptime85%Operators1I4600 pcs5 daysprocessS. Weld 1C/T39 sC/O10 minUptime100%Operators1I1100 pcs1.2 daysprocessS. Weld 2C/T46 sC/O10 minUptime80%Operators1I1600 pcs1.74 daysbottleneckAssembly 1C/T1 minUptime100%Operators1I1200 pcs1.3 daysprocessAssembly 2C/T40 sUptime100%Operators1I2700 pcs2.93 days5 days1 s5 days39 s1.2 days46 s1.74 days1 min1.3 days40 s2.93 dayswaitingworkingLead time17.18 daysProcessing time3.1 minValue adding0.02%Takt time1 min1 process cannot keep up with taktCycle Time vs TAKT020 s40 s60 stakt 60 s1 sStamping39 sS. Weld 158 sS. Weld 262 sAssembly 140 sAssembly 2the dashed part of a bar is what downtime adds
Value Stream MapperFind the bottlenecks. Optimize throughput.
4.555.56overall averageMachine AMachine BMachine CGroup average
One Way ANOVAAre there difference between groups? One factor. 3 or more groups.
50100150Material 1Material 2Material 315C70C125CSecond factor
Two Way ANOVAAre there differences or interactions between groups? Two factors.
455055602030405060Cure minutesStrength
Scatter plotDo the variables walk hand in hand, and how closely?
2492502515%10%25%50%75%90%95%Where each value sits in the order, as a percentageVolume
Normality plotWith an adjustable confidence band, are the data normal? Does it matter?
Mar 2Mar 9Mar 16Mar 23Mar 301. Design brief2. Order parts3. Strip line4. Install5. Commission6. Handover
Gantt ChartMap tasks, timelines, milestones and critical path.
75100125UCLLCLAv 105.53Weighted average
Exponentially Weighted Moving Average (EWMA)Fading weights are applied to data in the hope of better sensitivity.
0358USL 200LSL 2050100150200LifeHow many
Histogram 1Gain real process insight. Never hidden under a nonsensical normal distribution.
01234USL 200LSL 2050100150200LifeHow many
Histogram 2Gain more process insight by manipulating the bin widths.
YESYESYESYESStartIs continualimprovementimportant/Isexperienceimportant?Success is notcompulsoryIs costimportant?Is power andfunctionalityimportant?Invest in MAXIQfor successSpending doesn'tensure success.EndInferior softwareleads to failureCONTINUAL IMPROVEMENT
Process mapperStandard shapes and more. What does my process really look like?
0.501.001.501.001029480.87
Capability - CpkCapability indexes are not constants.  They are statistics that change over time.
TemperaturehighTimehighlow79.452.7
Design of ExperimentsAn observational approach will complement and complete any program of experimentation.
TOC/LP Optimizer: the product mix solid Every plan the factory could follow, bounded by its limits, in Valve, Pump, Manifold. Each flat face is a limit running out. The red corner is the best plan, 38.5 Valve, 52.4 Pump, 27.6 Manifold, worth $25,970. Valve0 to 50Pump0 to 60Manifold0 to 40Total welding time fullTotal test rig time fullTotal machining time full$25,970
TOC/LP OptimizerGenerate the optimum allocation of resources.

*Qualpro and Industry Week surveys

WHAT YOU GET

Competing software** reference Dr Wheeler


...but get it wrong.


With Maxi-Q you can be sure you get it right.


Dr Wheeler, the world's most respected and referenced process statistician, is a co-founder of Maxi-Q. He has written extensively about the failure of software to correctly implement process improvement statistics. Legacy software like** Minitab, JMP, Statgraphics, BPI, QImacros, Engine Room, SigmaXL all reference Dr Wheeler's brilliant work but fail to understand the theory. Their errors range from the "goofy" 1.5 sigma shift and nonsensical Six Sigma Tables, to a failure to understand rational subgrouping and the roles of normality and homogeneity.

Maxi-Q has many unique and innovative features to guide and assist users. The Process Mapper has automatic line drawing and optimal routing along with logic checking; histograms include a special tool to extract maximum process information. Maxi-Q is a comprehensive product including a broad suite of both statistical and non statistical process improvement tools.



50+ Improvement Tools

Process MapperFlowcharts that route themselves. Basic and extended ISO symbols. A logic checker that helps ensure that you work accurately.
Value Stream MapperStandard symbols, lead time, Takt and value added plus information flows. Graphical displays to highlight bottlenecks.
IdeasRigorous problem definition addresses many problems. Brainstorm possible causes and drag to Affinity groups.  Automatically generate an editable Cause and Effect Diagram.
Control chartsXmR, X-bar R, p, np, c, u, CuSum and EWMA. You can use either Box Cox normalization and/or Western Electrics rules, or select the correct approach.
Capability 8 PackCp, Cpk, Pp and Ppk are not constants.  They are statistics that vary over time.  Control charts are essential to determine stability for capability to mean anything.
Statisticst, z, F tests, Chi-square, ANOVA, ANOM, Gauge R&R, MSA, Mann Whitney, Kruskal-Wallis, 8 types of Design of Experiments, Multivariate etc; and their requirements.
Ramirez-Runger TestControl chart fall back. A homogeneity test; the test before all others. Unlike all other tests-of-fit, it takes the time-order sequence of the data into account.
GuidanceThe aim of MaxiQ is not to dump 50+ tools on you, but to guide you with simple instructions, in the correct path to process improvement.

COMPARE THE ALTERNATIVES

Why leaders are abandoning overpriced legacy suites.

Feature for feature against the packages a Lean Six Sigma team actually shortlists.
A double or triple tick is where Maxi-Q does more than tick the box.

 MAXI-QMinitabJMPStatgraphicsEngineRoom
Process Mapper✓✓✓✓✓
VSM✓✓✓✓✓
Brainstormer, Affinity Diagrammer✓✓✓
Cause & Effect✓✓✓✓✓✓✓✓
Pareto Chart✓✓✓✓✓
Scatter plot✓✓✓✓✓
Capability analysis✓
Descriptive statistics, t, F, z, ANOVA, Chi Square, DoE,
Gauge R&R, Mann Whitney, Krushal-Wallis, FEMA, MCS
✓✓✓✓✓
ANOM✓✓✓✓
Ramirez-Runger✓
SIPOC✓✓✓
Moods median, 2 proportions✓✓✓✓
XmR, XbarR✓✓✓
p, np, c, u, Cusum, EWMA charts✓✓✓✓✓
Histogram✓✓
TOC/LP Optimizer✓✓
Project guide✓
PRICE per annum per person$450$2394$1390$990$495
✓ has it ✓✓ does it better ✓✓✓ does it considerably better does not have it gives false or misleading results

PRICE

Seven days free. Then $450pa

The trial is the whole product, not a cut-down version.  It does not ask for a card. If it is not useful in a week it will not be useful in a month.

Free trial

$0

seven days, no card required

  • Every tool, unrestricted
  • Your own data
  • No card needed
  • Email support
Start the trial
SPECIAL INTRODUCTORY PRICE

Maxi-Q, one person

$450

per person per year

  • Every tool
  • A year of updates
  • Email support from the authors
  • Secure processing by 3rd party paddle.com, $6B+ in transactions.
Buy now

WHO IS BEHIND IT

Written by people who understand Process Improvement.

Dr Donald J. Wheeler

Statistician

Dr Donald J. Wheeler Has a B.A. in Mathematics, and holds M.S. and Ph.D. degrees in Statistics. He is a Fellow of the American Statistical Association and the American Society for Quality. He was a colleague of Professor W. Edwards Deming for 21 years and is a recipient of the Deming Medal. He has conducted over 1100 seminars on quality in 17 countries on five continents. He has written over 20 books and 400 articles, with a selection available here and in Quality Digest. Dr Wheeler has been teaching how to use data more effectively for over 50 years, with 44 years working in industry helping companies solve problems.

Dr Tony Burns

Engineering

Dr Tony Burns has a BE in Chemical Engineering with first class honours, and a PhD in Chemical Engineering. He has worked in the quality arena for 35 years. He is the author of the innovative e-learning product in quality, Q-Skills3D. Over 500,000 people from hundreds of companies around the world such as Microsoft, GE, Toyota, Delta Airlines, have benefitted from the software. Other software innovations in quality, include the Deming Funnel and Deming Red Beads, in interactive 3D Augmented Reality. Dr Burns has written over 300 papers on Quality Improvement, with a selection available here and in Quality Digest